Kitchen & Bathroom Remodel
A dated bungalow kitchen and two bathrooms stripped back and rebuilt while the owners stayed in the house.
The challenge
Old galvanised pipework had to be replaced without leaving the house without water overnight.
What we built
Strip-out, re-plumbing in PPR, new tiling, countertops, sanitary ware and repainting.
Materials used
- PPR pipework
- Wall and floor tiles
- Fitted countertops